docs: Phase 0 deferred items + Phase 1-4 worktree split plan
PHASE0_DEFERRED.md tracks the two W6 items that couldn't ship in Phase 0:
1. Delete src/pages/TaskView.ts — blocked on uncommitted multi-cycle
context menu changes; resolution path documents how to port to
FluentTaskView before deletion. Assigned to Phase 3 sub-PR D.4.
2. Fold src/utils/settings-migration.ts into the registry — has runtime
callers (repairStatusCycles every load + W1 fallback path) that need
proper relocation, not just delete. Resolution path documents the
four steps. Assigned to Phase 3 sub-PR D.2.
WORKTREE_PLAN.md is the operational follow-up to the v10 plan
(~/.claude/plans/dynamic-mixing-pie.md). Splits Phase 1-4 into 5
worktrees with explicit conflict maps, sequencing diagram, and DoD
subsets per worktree:
Worktree A — Phase 1 banners (parallel to B)
Worktree B — Phase 1 Archiver (parallel to A)
Worktree C — Phase 2 read-only (sequential after A)
Worktree D — Phase 3 cliff cluster (D.1-D.5 sequential within)
Worktree E — Phase 4 cleanup
Identifies the hot zone (src/index.ts and the 14 settings tabs) and
gives strict sequencing rules so multi-developer execution doesn't
collide. Solo-dev path is A→B→C→D.2→D.1→D.3→D.4→D.5→E.
This commit is contained in:
parent
d583e967dd
commit
e90fc53706
2 changed files with 589 additions and 0 deletions
96
PHASE0_DEFERRED.md
Normal file
96
PHASE0_DEFERRED.md
Normal file
|
|
@ -0,0 +1,96 @@
|
|||
# Phase 0 Deferred Items
|
||||
|
||||
Phase 0 of the v10 refactor (`refactor/v10-phase0` branch) completed 10 of 12
|
||||
DoD items. The remaining 2 are documented here so Phase 3 owners pick them up
|
||||
in the right sub-PR.
|
||||
|
||||
## Item 1: Delete `src/pages/TaskView.ts`
|
||||
|
||||
**Original DoD criterion:** "src/pages/TaskView.ts deleted; file gone;
|
||||
`git grep \"from \\\".*pages/TaskView\\\"\" src/` empty; typecheck passes"
|
||||
|
||||
**Why deferred:** the user has uncommitted modifications in `src/pages/TaskView.ts`
|
||||
(enhanced multi-cycle support in the "switch status" context menu). Deleting
|
||||
the file in Phase 0 would lose those modifications.
|
||||
|
||||
**Resolution path** (assigned to Phase 3 sub-PR D.4 — view consolidation):
|
||||
|
||||
1. Read the dirty `src/pages/TaskView.ts` diff. The relevant block is the
|
||||
"switch status" submenu builder (around line ~1263-1440 in the dirty version).
|
||||
2. Find the equivalent location in `src/pages/FluentTaskView.ts` and port the
|
||||
multi-cycle context menu logic. The new code reuses these helpers from
|
||||
`src/utils/status-cycle-resolver.ts`:
|
||||
- `findApplicableCycles(currentMark, statusCycles)`
|
||||
- `getAllStatusNames`
|
||||
- `getNextStatusPrimary`
|
||||
- `getAllStatusMarks`
|
||||
3. Move `TASK_VIEW_TYPE` constant from `src/pages/TaskView.ts` to a new file
|
||||
`src/common/view-types.ts` so the constant survives the deletion (stale
|
||||
leaves in user vaults still need to be detached on next load — see
|
||||
`src/index.ts:1825` and `:2116`).
|
||||
4. Update the two import sites of `TASK_VIEW_TYPE`:
|
||||
- `src/index.ts:72` (also remove the `TaskView` symbol from this import)
|
||||
- `src/components/features/fluent/FluentIntegration.ts:13`
|
||||
5. Delete the `instanceof TaskView` block at `src/index.ts:2119` — unreachable
|
||||
since the class is no longer registered.
|
||||
6. Delete `src/pages/TaskView.ts`.
|
||||
7. Run typecheck + integration suite to confirm green.
|
||||
|
||||
## Item 2: Fold `src/utils/settings-migration.ts` into the registry
|
||||
|
||||
**Original DoD criterion:** "src/utils/settings-migration.ts deleted; folded into
|
||||
registry; Migration.tombstone.test.ts covers the multi-cycle case"
|
||||
|
||||
**Why deferred:** the file has TWO non-migration runtime callers that need
|
||||
proper relocation, not just deletion:
|
||||
- `repairStatusCycles` is called every plugin load at `src/index.ts:2022`
|
||||
- `migrateSettings` is called from the W1 fallback path at `src/index.ts:2007`
|
||||
|
||||
A naive delete would break both. The Phase 0 W1 work bundled the migration
|
||||
logic into `legacy-bundle-0.ts` but kept the source file because the runtime
|
||||
helpers still need a home.
|
||||
|
||||
**Resolution path** (assigned to Phase 3 sub-PR D.2 — command palette rewrite,
|
||||
since D.2 owns the `index.ts` import block):
|
||||
|
||||
1. Move the runtime helpers to `src/utils/status-cycle-resolver.ts` (already
|
||||
exists, has the right name):
|
||||
- `repairStatusCycles`
|
||||
- `validateStatusCycle`
|
||||
- `sortCyclesByPriority`
|
||||
- `findDuplicateCycleIds`
|
||||
2. Confirm `migrateToMultiCycle` is no longer imported anywhere outside of
|
||||
`src/utils/migration/steps/legacy-bundle-0.ts`. As of Phase 0 it's also
|
||||
imported by `src/__tests__/migration/legacy-bundle-0.test.ts`. Either:
|
||||
(a) move `migrateToMultiCycle` body inline into both call sites and delete
|
||||
the export, OR
|
||||
(b) move `migrateToMultiCycle` to a new home like
|
||||
`src/utils/migration/legacy-helpers.ts` and update the two importers.
|
||||
Recommendation: (a) — the body is small (~30 LOC) and inlining removes a
|
||||
moving part.
|
||||
3. Update `src/index.ts:110-112` to import `repairStatusCycles` from its new
|
||||
home (`@/utils/status-cycle-resolver`).
|
||||
4. Remove the W1 fallback in `src/index.ts:2003-2010` — the registry has
|
||||
atomic semantics, so the fallback path is dead defense in depth that nobody
|
||||
should ever hit. (If you're worried, leave a single-line warning that the
|
||||
registry returned !ok.)
|
||||
5. Delete `src/utils/settings-migration.ts`.
|
||||
6. Run typecheck + integration suite to confirm green.
|
||||
|
||||
## When to do this work
|
||||
|
||||
Both items belong in the very first sub-PRs of Worktree D (Phase 3, 10.0.0).
|
||||
They are NOT for Phase 1 or Phase 2 — those phases are about adding warnings
|
||||
without touching the underlying view layer.
|
||||
|
||||
## Why these were deferred (not just dropped)
|
||||
|
||||
Both items are real DoD criteria from the plan. Skipping them entirely would
|
||||
mean Phase 0's "no observable behavior change + dead code removed" contract
|
||||
is incomplete. They're deferred to Phase 3 because:
|
||||
- Item 1 is blocked on user state we can't safely modify in Phase 0
|
||||
- Item 2 needs a proper home for runtime helpers, which is more refactor than
|
||||
"delete"
|
||||
|
||||
Phase 3's natural workflow already touches both areas, so picking them up
|
||||
there is cheap. Tracking them here ensures they don't get lost.
|
||||
493
WORKTREE_PLAN.md
Normal file
493
WORKTREE_PLAN.md
Normal file
|
|
@ -0,0 +1,493 @@
|
|||
# Task Genius v10 — Phase 1-4 Worktree Split
|
||||
|
||||
Operational follow-up to the v10 refactor plan
|
||||
(`~/.claude/plans/dynamic-mixing-pie.md`). That document is the source of
|
||||
truth for **what** to do in each phase. This document is the source of truth
|
||||
for **how to parallelize** the work across multiple worktrees / developers.
|
||||
|
||||
**Phase 0 status:**
|
||||
- 10 of 12 DoD items checked ✅
|
||||
- 2 items deferred (see [PHASE0_DEFERRED.md](./PHASE0_DEFERRED.md))
|
||||
- 5 commits on `refactor/v10-phase0`
|
||||
- 71 new passing tests; full suite stable at 39 pre-existing failed suites
|
||||
|
||||
**Sub-plugins:** Phase 1-4 also produces 4 new repos
|
||||
(`task-genius-workflow`, `task-genius-habits`, `task-genius-timer`,
|
||||
`task-genius-calendar-sync`). Those are NOT worktrees of this repo — they're
|
||||
independent repos. This document covers main-plugin worktrees only.
|
||||
|
||||
---
|
||||
|
||||
## Worktree principles
|
||||
|
||||
1. **One worktree per developer per concurrent task.** A worktree is
|
||||
`git worktree add ../tg-<phase>-<area> refactor/v10-<phase>-<area>` from
|
||||
the main repo.
|
||||
2. **Worktrees branch off `refactor/v10-phase0`** until that branch merges to
|
||||
master. After merge they branch off master.
|
||||
3. **Avoid concurrent worktrees touching the same files.** This document maps
|
||||
each phase's work to a "footprint" — the files it modifies — so collisions
|
||||
are predictable.
|
||||
4. **Each worktree owns its own DoD subset.** Don't merge a worktree until its
|
||||
subset is green.
|
||||
5. **Sub-plugin extraction is NOT worktree work.** Each extracted sub-plugin
|
||||
is a fresh repo. This doc only mentions them as dependencies.
|
||||
|
||||
---
|
||||
|
||||
## Conflict map
|
||||
|
||||
Which phases touch which key files:
|
||||
|
||||
| File | Phase 0 | Phase 1 | Phase 2 | Phase 3 | Phase 4 |
|
||||
|---|---|---|---|---|---|
|
||||
| `src/index.ts` | onunload race fixed; W1 wiring | + banner registration | + read-only mode | **rewrite**: 16 commands, hotkeys, deletes 27 commands | drop aliases |
|
||||
| `src/common/setting-definition.ts` | `_meta` field added | banner copy keys | none | **rewrite**: 25→7, 15→5 views | locale prune |
|
||||
| `src/components/features/settings/SettingsModal.ts` | none | none | read-only flag | **rewrite**: `renderTabContent` 25→7 | none |
|
||||
| `src/components/features/settings/tabs/*` | none | banner injection in 14 tabs | read-only mode in 14 tabs | **delete 14 tabs**, rewrite 7 | none |
|
||||
| `src/components/features/quick-capture/modals/*` | none | none | none | **delete 4 modals**, rename 1 | none |
|
||||
| `src/components/features/onboarding/*` | none | none | none | **delete 31 files**, add 4 | none |
|
||||
| `src/utils/ObsidianUriHandler.ts:117` | none | none | none | switch to redirect map | none |
|
||||
| `src/dataflow/Orchestrator.ts` | rebuild + onSettingsFieldsChanged | none | none | settings consolidation rewires scopes | none |
|
||||
| `src/widgets/registerWidgets.ts` | none | none | none | + TableWidget, QuadrantWidget | none |
|
||||
| `src/translations/locale/*` | none | en banner copy | en banner copy | en strings for new UI | **prune all 7 non-en** |
|
||||
| `src/migration/v10/*` (new) | none | + Archiver scaffold | + ViewMigration scaffold | + tab/view migration steps | tombstones for v10-archive |
|
||||
| `src/utils/migration/steps/*` | legacy bundle + sentinel | + v9.14 deprecation banners (no-op) | none | + v10 archive + view-cleanup | + v10.0.1 cleanup tombstones |
|
||||
|
||||
**The hot zone is `src/index.ts` and the settings tabs.** Phase 3 owns both
|
||||
ends of the rewrite. Phase 1 and Phase 2 are mostly additive (banner injection,
|
||||
read-only flagging) and can run in parallel with Phase 3 if scoped carefully.
|
||||
|
||||
---
|
||||
|
||||
## Worktree A — Phase 1 banners (9.14.0)
|
||||
|
||||
**Branch:** `refactor/v10-phase1-banners` off `refactor/v10-phase0`
|
||||
**Owner:** 1 developer
|
||||
**Calendar:** ~1 week
|
||||
|
||||
### Scope footprint
|
||||
|
||||
- `src/components/features/settings/components/DeprecationBanner.ts` (new)
|
||||
- `src/common/deprecation-messages.ts` (new)
|
||||
- `src/components/features/settings/tabs/WorkflowSettingsTab.ts` (banner injection)
|
||||
- `src/components/features/settings/tabs/HabitSettingsTab.ts`
|
||||
- `src/components/features/settings/tabs/RewardSettingsTab.ts`
|
||||
- `src/components/features/settings/tabs/TaskTimerSettingsTab.ts`
|
||||
- `src/components/features/settings/tabs/TimelineSidebarSettingsTab.ts`
|
||||
- `src/components/features/settings/tabs/IcsSettingsTab.ts` (OAuth section only)
|
||||
- `src/components/features/settings/tabs/IndexSettingsTab.ts` (file-as-task section)
|
||||
- `src/components/features/settings/tabs/DesktopIntegrationSettingsTab.ts` (electron-quick-capture section)
|
||||
- `src/components/features/settings/tabs/AboutSettingsTab.ts` (deprecations panel)
|
||||
- `src/components/features/settings/index.ts` (export new component)
|
||||
- `src/managers/changelog-manager.ts` (auto-open v10 announcement)
|
||||
- `src/translations/locale/en.ts` (new banner copy)
|
||||
|
||||
### Tasks
|
||||
|
||||
1. Build the `DeprecationBanner` component (~60 LOC)
|
||||
2. Build the `deprecation-messages.ts` strings file (~80 LOC)
|
||||
3. Wire banner into 14 deprecated tab files (one-line call each)
|
||||
4. Add the "Deprecations" collapsible to AboutSettingsTab (~50 LOC)
|
||||
5. Wire ChangelogManager to auto-open the v10 announcement on first launch of 9.14.0
|
||||
6. Update `CHANGELOG.md` and create the pinned GitHub Discussion (out of repo)
|
||||
|
||||
### Conflicts to watch
|
||||
|
||||
Phase 3 will rewrite the same 14 tabs. When Phase 1 merges first, Phase 3
|
||||
needs to pull and resolve the banner injection (which gets deleted in Phase 3
|
||||
anyway). Plan: Phase 3 starts AFTER Phase 1 is merged so the rebase is clean.
|
||||
|
||||
### DoD subset
|
||||
|
||||
- 14 tabs show banners in real-vault smoke test
|
||||
- "Export this section" button in each banner calls a stub `Archiver` fn
|
||||
- Changelog modal auto-opens once on 9.14.0 first launch
|
||||
- No regression in existing tab rendering
|
||||
|
||||
---
|
||||
|
||||
## Worktree B — Phase 1 Archiver (parallel to A)
|
||||
|
||||
**Branch:** `refactor/v10-phase1-archiver` off `refactor/v10-phase0`
|
||||
**Owner:** 1 developer (can be the same person as A, sequenced)
|
||||
**Calendar:** ~1 week (overlaps with A)
|
||||
|
||||
### Scope footprint
|
||||
|
||||
- `src/migration/v10/Archiver.ts` (new, ~300 LOC)
|
||||
- `src/migration/v10/index.ts` (new barrel)
|
||||
- `src/__tests__/migration/v10/Archiver.test.ts` (new)
|
||||
|
||||
### Tasks
|
||||
|
||||
1. Implement `archiveWorkflows`, `archiveHabits`, `archiveRewards`,
|
||||
`archiveTimerData`, `archiveCalDavSources`, `archiveRemovedViews`,
|
||||
`archiveOrphans` as **pure functions** over `plugin.settings`
|
||||
2. Each returns `{files: Map<string, string>, summary: string}` — strict no-IO
|
||||
contract
|
||||
3. Test fixture: realistic settings with each section populated → assert
|
||||
archive contents are correct
|
||||
4. **Do NOT wire into MigrationRegistry yet** — that's Phase 3
|
||||
|
||||
### Why a separate worktree
|
||||
|
||||
Worktree A modifies UI files; Worktree B modifies new files in
|
||||
`src/migration/v10/`. Zero conflict. Both can land in 9.14.0 even though only
|
||||
A is user-visible.
|
||||
|
||||
### DoD subset
|
||||
|
||||
- All 7 archive functions return correct shapes for known inputs
|
||||
- `Archiver.test.ts` has 1 fixture per archive section
|
||||
- Archiver functions work in jest WITHOUT a real vault (pure transformations)
|
||||
|
||||
---
|
||||
|
||||
## Worktree C — Phase 2 read-only (9.15.0)
|
||||
|
||||
**Branch:** `refactor/v10-phase2-readonly` off **master after A merges**
|
||||
**Owner:** 1 developer
|
||||
**Calendar:** ~1 week
|
||||
|
||||
### Scope footprint
|
||||
|
||||
- All 14 deprecated settings tab files (add `disabled` flag to inputs)
|
||||
- `src/components/features/settings/components/DeprecationBanner.ts` (banner copy update: "moves to" → "read-only — export now")
|
||||
- `src/index.ts` (deprecated commands wrap with first-use Notice)
|
||||
- `src/common/deprecation-messages.ts` (add Notice strings)
|
||||
- `src/managers/changelog-manager.ts` (10.0.0-beta.1 announcement)
|
||||
- `manifest-beta.json` (bump to 10.0.0-beta.1)
|
||||
|
||||
### Tasks
|
||||
|
||||
1. Add a `readOnly` prop to each deprecated tab's render function; when true,
|
||||
every `Setting()` chain calls `.setDisabled(true)` and exports remain enabled
|
||||
2. Wrap deprecated commands with one-shot Notice (per-session memory, not
|
||||
settings)
|
||||
3. Cut 10.0.0-beta.1 via BRAT
|
||||
4. Coordinate sub-plugin v0.1.0 releases (out of repo): `task-genius-workflow`,
|
||||
`task-genius-habits`, `task-genius-timer`
|
||||
|
||||
### Conflicts to watch
|
||||
|
||||
Same 14 tabs as Worktree A. **Worktree C must merge after A**, no concurrency.
|
||||
Phase 3 rewrite of these tabs comes after C merges.
|
||||
|
||||
### DoD subset
|
||||
|
||||
- All deprecated tabs are visually disabled (inputs grayed out)
|
||||
- Export buttons still functional
|
||||
- Deprecated commands fire Notice on first use per session
|
||||
- 10.0.0-beta.1 published to BRAT and a real beta tester confirms it loads
|
||||
|
||||
---
|
||||
|
||||
## Worktree D cluster — Phase 3 cliff (10.0.0)
|
||||
|
||||
**Branch:** `refactor/v10-phase3-cliff` off master after C merges
|
||||
**Owner:** 1-2 developers (this is the biggest worktree)
|
||||
**Calendar:** ~1 week of focused work
|
||||
|
||||
This worktree should be split into FOUR sub-PRs that land sequentially on the
|
||||
worktree branch:
|
||||
|
||||
### D.1 — Settings tab rewrite (25 → 7)
|
||||
|
||||
**Files:**
|
||||
- `src/components/features/settings/SettingsModal.ts` (`renderTabContent` switch)
|
||||
- `src/components/features/settings/tabs/*` (delete 14, rewrite 7)
|
||||
- `src/components/features/settings/index.ts` (exports)
|
||||
- `src/components/features/settings/components/DeprecationBanner.ts` (delete)
|
||||
- `src/common/deprecation-messages.ts` (delete)
|
||||
- `src/utils/ObsidianUriHandler.ts:117` (switch to redirect map)
|
||||
- `src/utils/uri-tab-redirects.ts` (new)
|
||||
- `src/migration/v10/TabIdMap.ts` (new)
|
||||
- All `src/components/features/settings/tabs/{Workflow,Habit,Reward,TaskTimer,TimelineSidebar}*.ts` (delete)
|
||||
|
||||
**Why a separate sub-PR:** lets you review tab consolidation in isolation. The
|
||||
deletions are big but mechanical.
|
||||
|
||||
### D.2 — Command palette + hotkeys (43 → 16)
|
||||
|
||||
**Files:**
|
||||
- `src/index.ts` (command registration block — major rewrite)
|
||||
- `src/commands/*.ts` (delete: completedTaskMover, sortTaskCommands, taskCycleCommands, taskMover, workflowCommands)
|
||||
- New consolidated command files in `src/commands/v10/` for the 16 new commands
|
||||
|
||||
**Why separate:** the command rewrite touches a huge stretch of `index.ts` and
|
||||
is easy to test in isolation (jest test that the right commands are registered
|
||||
with the right hotkeys).
|
||||
|
||||
**Includes Phase 0 deferred Item 2:** fold `src/utils/settings-migration.ts`
|
||||
into the registry. See `PHASE0_DEFERRED.md` for the resolution path.
|
||||
|
||||
### D.3 — Quick capture modal consolidation (5 → 1)
|
||||
|
||||
**Files:**
|
||||
- `src/components/features/quick-capture/modals/{QuickCaptureModal,MinimalQuickCaptureModal,MinimalQuickCaptureModalWithSwitch,BaseQuickCaptureModal}.ts` (delete)
|
||||
- `src/components/features/quick-capture/modals/QuickCaptureModalWithSwitch.ts` → rename to `QuickCaptureModal.ts`
|
||||
- New `Mode` strip UI inside the survivor
|
||||
- `src/utils/migration/steps/v10-quick-capture-modes.ts` (new)
|
||||
- `src/index.ts` (command callback updates)
|
||||
|
||||
**Why separate:** quick-capture is a self-contained subsystem with its own
|
||||
tests. Easy to verify in isolation.
|
||||
|
||||
### D.4 — View consolidation + onboarding compression + deletions
|
||||
|
||||
**Files:**
|
||||
- `src/components/features/{gantt,quadrant,habit}/*` (delete)
|
||||
- `src/components/features/timeline-sidebar/*` (delete)
|
||||
- `src/components/features/onboarding/**` (delete 31 files, add 4)
|
||||
- `src/widgets/registerWidgets.ts` (add TableWidget, QuadrantWidget)
|
||||
- `src/widgets/views/TableWidgetView.ts` (new, port from `src/components/features/table/`)
|
||||
- `src/widgets/views/QuadrantWidgetView.ts` (new, ~200 LOC)
|
||||
- `src/migration/v10/ViewMigration.ts` (new)
|
||||
- `src/utils/migration/steps/v10-view-cleanup.ts` (new)
|
||||
- `src/common/setting-definition.ts` (`viewConfiguration` defaults: 15 → 5)
|
||||
- `src/managers/{habit-manager,reward-manager,timer-manager,electron-quick-capture}.ts` (delete)
|
||||
- `src/services/{timer-export-service,timer-format-service,timer-metadata-service}.ts` (delete)
|
||||
- `src/managers/calendar-auth-manager.ts` (delete — moves to calendar-sync sub-plugin)
|
||||
- `src/providers/*` (delete entire dir)
|
||||
- `src/parsers/holiday-detector.ts` (delete)
|
||||
- `src/dataflow/sources/FileSource.ts` (delete)
|
||||
- `src/editor-extensions/workflow/*` (delete entire dir)
|
||||
- `src/editor-extensions/date-time/task-timer.ts` (delete)
|
||||
- `src/pages/TaskView.ts` (delete after porting dirty changes — see `PHASE0_DEFERRED.md` Item 1)
|
||||
|
||||
**Why separate:** this is the biggest deletion sweep. ~50% of the LOC reduction
|
||||
lands here. Splitting it from D.1-D.3 lets reviewers digest the conceptual
|
||||
deletions separately from the structural rewrites.
|
||||
|
||||
**Includes Phase 0 deferred Item 1:** delete `src/pages/TaskView.ts`. See
|
||||
`PHASE0_DEFERRED.md` for the resolution path (port multi-cycle context menu
|
||||
to FluentTaskView first).
|
||||
|
||||
### D.5 — Migration confirmation modal (cross-sub-PR, lands last)
|
||||
|
||||
The migration confirmation modal touches files from multiple sub-PRs:
|
||||
- `src/migration/v10/ConfirmationModal.ts` (new)
|
||||
- `src/utils/migration/steps/v10-archive.ts` (new — wraps Archiver from Worktree B)
|
||||
- `src/index.ts` (first-launch detection in onload)
|
||||
|
||||
This work should land last on the D branch, after D.1-D.4 are stable. It
|
||||
depends on the Archiver from Worktree B being available.
|
||||
|
||||
### Conflicts within Worktree D
|
||||
|
||||
D.1-D.4 each touch `src/index.ts` differently:
|
||||
- D.1 changes settings tab routing
|
||||
- D.2 rewrites commands
|
||||
- D.3 changes quick-capture commands
|
||||
- D.4 deletes timer/workflow commands
|
||||
|
||||
**Sequence them: D.2 first (it owns the command block), then D.1, D.3, D.4 in
|
||||
any order, then D.5 last.**
|
||||
|
||||
### DoD subset
|
||||
|
||||
The §3.10 acceptance test from the main plan — the "single hardest test" with
|
||||
47 workflows + 12 habits + etc:
|
||||
|
||||
> A user upgrades from 9.13.1 with: 47 workflows, 12 habits, 3 ICS sources,
|
||||
> 2 OAuth calendars, 5 custom views, 3 workspaces, all 25 settings tabs touched
|
||||
> at least once. After upgrading to 10.0.0, they:
|
||||
> 1. See the migration modal within 3 seconds.
|
||||
> 2. Click Apply.
|
||||
> 3. See their Inbox.
|
||||
> 4. Capture a task with `Mod+Shift+T`.
|
||||
> 5. Mark it done.
|
||||
> 6. Open `Task Genius Archive/` and see all their data.
|
||||
>
|
||||
> If any of those six steps requires reading docs, opening Settings, or
|
||||
> restarting Obsidian — **it's not done.**
|
||||
|
||||
---
|
||||
|
||||
## Worktree E — Phase 4 cleanup (10.0.1)
|
||||
|
||||
**Branch:** `refactor/v10-phase4-cleanup` off master after D merges
|
||||
**Owner:** 1 developer
|
||||
**Calendar:** ~1 week
|
||||
|
||||
### Scope footprint
|
||||
|
||||
- `src/migration/v10/Archiver.ts` (delete)
|
||||
- `src/utils/migration/steps/v10-archive.ts` → tombstone-only marker
|
||||
- `src/utils/migration/steps/v10-view-cleanup.ts` → tombstone marker
|
||||
- `src/index.ts` (drop one-version command aliases)
|
||||
- `scripts/prune-locale-orphans.mjs` (new)
|
||||
- All non-en `src/translations/locale/*.ts` (prune)
|
||||
- `src/__tests__/locale-parity.test.ts` (new)
|
||||
|
||||
### Tasks
|
||||
|
||||
1. Run the locale prune script for real
|
||||
2. Tombstone the migration code itself (the registry will find it's already
|
||||
applied via `_meta` and skip)
|
||||
3. Drop command aliases that were kept for one version
|
||||
4. Release `task-genius-calendar-sync` v0.1.0 (the riskiest sub-plugin, held
|
||||
until now)
|
||||
|
||||
### Conflicts to watch
|
||||
|
||||
None. By this point Phase 3 is merged and stable.
|
||||
|
||||
---
|
||||
|
||||
## Sequencing diagram
|
||||
|
||||
```
|
||||
phase0 (DONE on refactor/v10-phase0)
|
||||
|
|
||||
+---> Worktree A (banners, 9.14.0) ---+
|
||||
| |
|
||||
+---> Worktree B (Archiver, parallel) -+--> [merge to master, tag 9.14.0]
|
||||
|
|
||||
v
|
||||
Worktree C (read-only, 9.15.0)
|
||||
|
|
||||
v
|
||||
[merge to master, tag 9.15.0 + 10.0.0-beta.1]
|
||||
|
|
||||
v
|
||||
Worktree D cluster (cliff, 10.0.0)
|
||||
/----D.2 (commands)
|
||||
| |
|
||||
| +---D.1 (settings tabs)
|
||||
| |
|
||||
| +---D.3 (quick capture)
|
||||
| |
|
||||
| +---D.4 (views + deletions + onboarding)
|
||||
| |
|
||||
| +---D.5 (confirmation modal, last)
|
||||
|
|
||||
+--> [merge to master, tag 10.0.0]
|
||||
|
|
||||
v
|
||||
Worktree E (cleanup, 10.0.1)
|
||||
|
|
||||
v
|
||||
[merge to master, tag 10.0.1]
|
||||
```
|
||||
|
||||
**Critical path:** A → C → D.2 → D.1/3/4 (parallel) → D.5 → E
|
||||
|
||||
**Off-critical path:** Worktree B (Archiver) — can merge any time before D.5
|
||||
|
||||
### Calendar estimates
|
||||
|
||||
- **Solo dev:** ~7 weeks
|
||||
- **2 devs running A+B in parallel, then sequencing C→D→E:** ~6 weeks
|
||||
- **2 devs running D.1-D.4 in parallel during Phase 3:** ~5 weeks
|
||||
|
||||
---
|
||||
|
||||
## Setup commands for each worktree
|
||||
|
||||
From the main repo root:
|
||||
|
||||
```bash
|
||||
# Worktree A
|
||||
git worktree add ../tg-phase1-banners refactor/v10-phase0
|
||||
cd ../tg-phase1-banners
|
||||
git checkout -b refactor/v10-phase1-banners
|
||||
|
||||
# Worktree B (parallel to A)
|
||||
git worktree add ../tg-phase1-archiver refactor/v10-phase0
|
||||
cd ../tg-phase1-archiver
|
||||
git checkout -b refactor/v10-phase1-archiver
|
||||
|
||||
# Worktree C (after A merges to master)
|
||||
git worktree add ../tg-phase2-readonly master
|
||||
cd ../tg-phase2-readonly
|
||||
git checkout -b refactor/v10-phase2-readonly
|
||||
|
||||
# Worktree D (after C merges to master)
|
||||
git worktree add ../tg-phase3-cliff master
|
||||
cd ../tg-phase3-cliff
|
||||
git checkout -b refactor/v10-phase3-cliff
|
||||
|
||||
# Worktree E (after D merges to master)
|
||||
git worktree add ../tg-phase4-cleanup master
|
||||
cd ../tg-phase4-cleanup
|
||||
git checkout -b refactor/v10-phase4-cleanup
|
||||
```
|
||||
|
||||
To clean up after merging:
|
||||
|
||||
```bash
|
||||
# From main repo
|
||||
git worktree remove ../tg-phase1-banners
|
||||
git branch -d refactor/v10-phase1-banners
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Pre-flight checks before starting any worktree
|
||||
|
||||
Before beginning work on a worktree, the assignee should:
|
||||
|
||||
1. **Read** `~/.claude/plans/dynamic-mixing-pie.md` (the main v10 plan) — this
|
||||
document is operational; the main plan has the rationale.
|
||||
2. **Check Phase 0 is merged** — `git log master --oneline | grep "Phase 0"`.
|
||||
If not, the worktree should branch off `refactor/v10-phase0`, not master.
|
||||
3. **Run the integration tests on the base branch** —
|
||||
`npm test -- --testPathPattern="integration/"` should report 73+ passing in
|
||||
the Phase 0 suite. If it doesn't, the base branch is broken and needs
|
||||
investigation before any new work.
|
||||
4. **Confirm no overlap with active worktrees** — check the conflict map above.
|
||||
|
||||
---
|
||||
|
||||
## Risks specific to the worktree split
|
||||
|
||||
| Risk | Mitigation |
|
||||
|---|---|
|
||||
| Worktree A and Worktree C touching the same 14 tab files cause merge headaches | Hard sequencing rule: C does not start until A is merged to master |
|
||||
| Worktree D.1-D.4 both touch `src/index.ts` | D.2 (commands) must merge first; D.1/3/4 rebase onto it |
|
||||
| Worktree B (Archiver) ships before Worktree D.5 wires it in | Worktree B's tests are pure-function tests — nothing wires it to user-facing UI in Phase 1, so it's safe to ship "dormant" code |
|
||||
| Sub-plugin extraction blocks Worktree D.4 | Sub-plugins ship v0.1.0 in parallel with Worktree C (Phase 2). By the time D.4 starts, the sub-plugins exist as ghost installations |
|
||||
| Phase 0 deferred items leak into Phase 1+ | See [PHASE0_DEFERRED.md](./PHASE0_DEFERRED.md) — items are explicitly assigned to D.2 and D.4 |
|
||||
|
||||
---
|
||||
|
||||
## Communication plan
|
||||
|
||||
### Multi-developer execution
|
||||
|
||||
- Daily standup: which worktree are you on, what's blocked
|
||||
- Worktree owner pings before merging so others can pull
|
||||
- Block all worktrees during Phase 3 merge weekend — D's merge is the
|
||||
highest-conflict event
|
||||
- Tag releases ONLY after the corresponding DoD subset is verified
|
||||
|
||||
### Solo execution (one developer running the whole plan)
|
||||
|
||||
Just go A → B → C → D.2 → D.1 → D.3 → D.4 → D.5 → E in order. The worktree
|
||||
split is then mostly informational; you can use a single working tree if you
|
||||
prefer.
|
||||
|
||||
---
|
||||
|
||||
## Verification
|
||||
|
||||
Each worktree's "done" criterion is its DoD subset (listed in each worktree
|
||||
section). The overall verification is the §3.10 acceptance test from the main
|
||||
plan — the 6-step test where a real user upgrades from 9.13.1 with 47 workflows
|
||||
+ 12 habits + etc.
|
||||
|
||||
After all worktrees merge, run the full integration suite from the master
|
||||
branch:
|
||||
|
||||
```bash
|
||||
cd <main-repo>
|
||||
git checkout master
|
||||
git pull
|
||||
npm install
|
||||
npm test -- --testPathPattern="integration/"
|
||||
# Expect: 80+ passing, 0 failing in the integration namespace
|
||||
npm test
|
||||
# Expect: pre-existing failure count, no new failures introduced by v10 work
|
||||
```
|
||||